| Sign In | Join Free | My entremaqueros.com |
|
Brand Name : Haida
Model Number : HD-E910
Certification : CE,,ISO
Place of Origin : China
MOQ : 1
Price : Negotiation
Payment Terms : L/C,T/T,D/A,D/P,Western Union,MoneyGram
Supply Ability : 300 Sets per Month
Delivery Time : 20 days after order confirmed
Packaging Details : each set protected with resin fiber and PP film, then put into Strong wooden case with operation man
This machine equipment employs a combined forward pressure application and reverse suction pressure mode of operation, enabling it to meet the pressure testing requirements for photovoltaic modules under extreme climatic conditions such as deserts and plateaus.
1. Structure
| 2.1 Cooling System | ||
| 1 | The refrigerating system equips Germany Bock Compressor, and uses environmentally friendly refrigerant (R404a). Adopting binary low temperature circuit system design, it is convenient to use different compressors for work in different temperature regions. | |
| 2 | Temperature control using P.I.D + S.S.R system coordinated control with the same channel. It has the function of automatic calculation, which can immediately modify the temperature change conditions to make the temperature control more accurate and stable. | |
| 3 | High-precision controllers of temperature. The temperature performance is accurately set and displayed with a resolution of 0.1 ℃. | |
| 2.2 Temperature System | ||
| 1 | Temperature system using Nickel-chromium alloy high-speed heating electric wire; | |
| 2 | High temperature system is completely independent; | |
| 3 | The system using stainless steel tube built-in nickel-chromium alloy high-speed heating electric wire and high-temperature magnesium oxide powder, which has fast response and long life; | |
| 4 | The temperature system is completely independent | |
| 2.3 Control System | ||
| Temperature Sensor | High precision PT100 Platinum resistance | |
| Controller | TATO | |
| Display Function | a. Temperature Setting (SV) Practical (PV) value can be displayed directly b. Display numbers, paragraphs, remaining time and cycles, running time c. Program editing and graphic curve display, d. Fixed or program operation status display, | |
| Interface | a. RS-232 or R485 port design b. Connected to computer c. Monitor and remote control by computer and Ethernet optional | |
| 2.4 Protection System | ||
| 1 | Protection for Electrical leakage | |
| 2 | Over-temperature | |
| 3 | Compressor overvoltage and overload | |
| 4 | Heater short circuit | |



|
|
HD-E910 Mechanical Load Test Machine Images |